Testimonials

Wiper Mite Products Ltd

Your company was a pleasure to deal with on the fabrication of our stainless steel tube and fittings. On time and as per quote... Depending on the results of our experimentation with the new setup, I am hoping that we will be able to supply you with some sample product to equal to the quality of your own work.

 

Daryl Price

Wiper Mite Products Ltd

 

 

Georgian Projects Ltd

 

“Dewatering Specialists were contacted to install a wellpoint dewatering system during the construction of a basement car park for an apartment complex in Mairangi Bay.

The system was maintained by Dewatering Specialists to ensure optimum performance and a reinjection and monitoring program was established to control drawdown levels. The water level was lowered by 2m and operated continuously for 24 hours a day from August through October 2003 with no distruptions to our building program. The discharge water was pumped through a filter system to ensure no sand entered the storm water system.

 

Dewatering Specialists were able to respond immediately and to offer technical and practical advise concerning the system to facilitate the smooth efficient operation of the construction process.

 

I would recommend Dewatering Specialists for any future projects requiring wellpoint dewatering. Their team was competent and professional in the manner in which they assisted me. Lawrence Schischka, the Manager of Dewatering Specialists, was most helpful at all times. John Doyle, a Director of the Company, was available to make suggestions and recommendations that ensured the dewatering program was to keep on track and the excavation dry.

 

Our Company received a refund from Dewatering Specialists at the end of the contract. This has not happened very often, if ever.”

 

Wayne Wallace

Director: Georgian Projects Ltd

 

 

Wooding Construction Ltd

 

“Dewatering Specialists Ltd were recently contacted by our Company to design and install a wellpoint system for a 30 apartment project in Paihai.

 

The complex included a full basement, requiring excavation approximately 1m below the water table. The system installed kept the excavation water free throughout the period of basement construction.

 

John Doyle and his team were efficient and knowledgeable but also a pleasure to work with from quotation through to system removal. Throughout the period the system was installed, John made regular contact to check that all was in order and to see if there was anything his Company could improve for us.

 

We would use Dewatering Specialist for any future development requiring dewatering with pleasure. We accordingly would not hesitate to recommend this companies services.”

 

Keith Halton

Contracts Manager: Wooding Construction Ltd

 

 

Millar Paterson Metals Ltd

Nice job the committee are all well pleased.

 

John Millar.

MILLAR, PATERSON METALS LTD